IMG_0372
IMG_0375
IMG_0373
IMG_0370
IMG_0374
IMG_0377
IMG_0378
IMG_0376
IMG_0379

McAsphalt expanded their Winnipeg plant to produce rubber-based asphalt. The plant added a steel structure building to house mixing equipment, 1600A sub distribution and six huge 20’ high tanks outside to hold the product. The electrical work consists of:

  • Building racking and cable tray to site equipment location
  • 1600A sub service CDP
  • Wire and connect pumps, lighting, specialty asphalt equipment
  • Wire and connect, fiber, PLC controls and data
  • PLC commissioning